Posts Tagged ‘ show build ’

068: Show Build (Final Day)

Finally, everything is put up and works well. I’m quite satisfied with the installation. The hardest thing would be putting up the fabric, it’s hard to make it perfect but I tried my ┬ábest. Today is more about cleaning up the space and tape everything to be neat and tidy. The main thing I just found out since testing the cable that connects the dvd player and the screen is that it always results differently each time I turn it on. Interesting. Anyway, my project is ready for the show! :)))

Work in progress pictures:

Final installation:

Advertisements

067: Show Build

I was working at Uni everyday last week, from painting and cleaning and preparing the space on Day 1 until yesterday. Tomorrow is going to be the last day of show build, which I need to put up the fabric on another side and finalize my installation. Here are the progress..

DAY 2: After cleaning up and painted the space on Day 1, it took all day to fix everything. On Day 2 it’s all about moving stuff including plinths. The wall was put back on, fixed and painted. It looks white and clean now.

Day 3: Testing with screen and glitch effect

Day 4: Testing projector and screen

Day 5: Testing everything together, including prints

Day 6: (to be continued)